This technical guide explains sizing protective devices for instant capacitor bank switching and fault duty.
Methods include kvar calculations, inrush current estimation, short-circuit contribution, and protective device selection criteria standards.
Instant Capacitor Bank Protective Device Sizing – kVAr, Inrush and Fault Duty
Fundamentals of capacitor bank protective device sizing
Capacitor banks present two principal electrical challenges for protective device sizing: steady-state reactive currents and high transient currents produced during switching or fault conditions. Protective device selection must address continuous thermal loading, momentary high inrush or switching transients, and prospective fault duties (making and breaking). For reliable protection and longevity, calculate both the steady-state current (for continuous conductor and breaker rating) and the transient peak and energy (for short-time withstand and fuse I2t). Key terms used in this article:- Kvar / Q: reactive power of the capacitor bank in VAR or kVAR.
- V (VL): nominal line-to-line voltage.
- IQ: steady-state capacitive current (fundamental component).
- Ipeak: peak transient current due to switching or resonance.
- SSC: available short-circuit power (three-phase fault MVA at point of connection).
- Zs: source (system) short-circuit impedance in ohms.
- C: capacitance in farads per relevant connection (per-phase or total depending on connection method).
- L: equivalent source inductance in henrys (from transformer/leakage inductance and system reactance).
Mathematical relations and derived formulas
All formulas are written using plain HTML elements. Each formula is followed by definition of variables and typical numeric ranges.Steady-state reactive current (three-phase)
For a 3-phase capacitor bank, the steady-state reactive current magnitude is:
- I_Q = steady-state reactive current (A).
- Q = reactive power of the bank (VAR).
- V = line-to-line RMS voltage (V).
- Typical values: Q from 100 kVAR to several MVAr; V commonly 480 V, 600 V, 6.6 kV, 11 kV, etc.
Capacitance from kvar (three-phase)
For a star (wye) connected bank:C = Q / (omega * V2)

C = Q / (3 * omega * V2)
Where:- C = capacitance in farads (per-phase for the given connection).
- omega = 2 * pi * f (rad/s), f = grid frequency (50 or 60 Hz).
- V = line-to-line RMS voltage (V).
- Note: formulas give total capacitance per phase required to provide the quoted Q at rated voltage.
- At 60 Hz, omega ≈ 377 rad/s; at 50 Hz, omega ≈ 314 rad/s.
- For 480 V, 600 kVAR (wye): C = 600000 / (377 * 4802) ≈ 6.9e-3 F total per bank divided per phase as appropriate.
Resonant initial transient (worst-case peak current)
When a charged capacitor is switched into a network with source inductance, the initial transient peak can be estimated by energy conservation between capacitor and source inductance:- I_peak = transient peak current (A).
- Z_s = source short-circuit impedance (ohm) seen by the capacitor bank at rated voltage.
- S_SC = three-phase short-circuit apparent power (VA) at the bus where the capacitor is switched.
- Derivation uses C = Q / (omega * V2) and L = Z_s / omega.
- Typical behavior: I_peak can be an order of magnitude (10x–50x) higher than I_Q depending on stiffness of supply and Q magnitude.
Transient energy (I2t) used for fuse selection
A simple conservative estimate for the thermal energy exposure during the first oscillatory cycle assumes sinusoidal current with amplitude I_pk and frequency f. The I2t per full cycle is:I2t_cycle ≈ I_peak2 / (2 * f)
Where:- I2t_cycle has units of A2s and can be compared to fuse let-through I2t tables.
- This estimate is conservative for undamped oscillation; real networks have series resistance and damping that reduce subsequent cycles.
- For 60 Hz, I2t_cycle ≈ I_peak2 / 120.
Practical components affecting inrush and fault duty
Protective device sizing must consider both capacitor internal properties and network characteristics:- Capacitor ESR and ESL: lower ESR/ESL increases transient peaks and reduces damping.
- Switching instant (point-on-wave): switching at peak voltage increases energy and peak current versus switching at voltage zero.
- System source stiffness: higher SSC (stiffer system) usually means higher fault current and higher I_peak for capacitive switching.
- Transformers and reactors: series reactors limit inrush and can be used to reduce transients; detuned reactors alter harmonic interaction.
- Connection method: delta vs star changes per-phase voltage across capacitors, altering C required and transient magnitudes.
Protective device: selection criteria
Select protective devices using layered criteria:- Continuous current rating: must be ≥ 125% of I_Q for thermal margin (local code dependent).
- Making capacity and peak withstand current: device must withstand I_peak without errant operation or damage.
- I2t withstand or let-through: for fuses, compare calculated I2t to fuse I2t characteristics; for breakers, check energy withstand and opening time.
- Short-time rating (Icw): breaker must handle short duration thermal duty if bank produces fault contribution during upstream faults.
- Coordination: device curve must be coordinated with upstream protection to avoid nuisance operations and to ensure selective clearing of faults.
- Use time-delayed fuses (e.g., class gG with time-delay or special capacitor fuses) to avoid blowing on switching inrush when necessary.
- Use circuit breakers with adjustable instantaneous and short-time delay settings. Instantaneous pickup must be set above inrush but below fault levels requiring immediate interruption.
- Employ pre-insertion resistors or inrush limiting reactors for large banks to reduce I_peak and I2t.
- Consider synchronous closing devices or surge limiters to control point-on-wave switching.
Tables of typical values
| Parameter | Typical Range | Notes |
|---|---|---|
| Capacitor ESR (per phase) | 0.1 mΩ – 50 mΩ | Film capacitors low ESR; values depend on manufacturer and voltage rating. |
| ESL (per phase) | 5 nH – 2 μH | Smaller units have lower ESL; affects high-frequency switching peaks. |
| Inrush multiple (I_peak / I_Q) | 5 – 50+ | Range depends on system stiffness and switching timing; use conservative values for sizing. |
| Fuse classes | gG, aR, gR, NH | gG general purpose; aR for protecting against short-circuit with selective tripping. |
| Transformer %Z typical | 4% – 10% | Lower %Z yields stiffer system and larger inrush peaks. |
| System frequency | 50 Hz / 60 Hz | Use correct omega = 2πf in capacitance calculations. |
| Common Capacitor Sizes | Voltage Rating | Approx. Capacitance (per phase) at 50 Hz |
|---|---|---|
| 100 kVAR | 400–480 V | ~0.0009 F (wye) |
| 300 kVAR | 480 V | ~0.0026 F (wye) |
| 600 kVAR | 480 V | ~0.0052 F (wye) |
| 2 MVAR | 11 kV | ~1.32e-5 F (wye) |
Detailed worked examples
At least two real cases with full development follow. Each example computes C, steady-state current, transient peak by the derived formula, approximate I2t, and recommends protective device characteristics.Case 1 — Low-voltage large bank: 600 kVAR at 480 V, 60 Hz
Data:- Q = 600 kVAR = 600,000 VAR
- V = 480 V (line-to-line)
- f = 60 Hz (omega = 2π*60 = 377 rad/s)
- System short-circuit power S_SC = 100 MVA = 100,000,000 VA (three-phase)
I_Q = Q / (sqrt(3) * V) = 600000 / (1.732 * 480) = 600000 / 831.38 = 722 A (approx).
Step 2 — Per-phase capacitance (wye):C = Q / (omega * V2) = 600000 / (377 * 4802)
Compute:- 4802 = 230,400
- Denominator = 377 * 230,400 = 86,860,800
- C ≈ 600,000 / 86,860,800 ≈ 0.006906 F (6.906 mF) per phase bank total for 3-phase wye.
Z_s = V2 / S_SC = 4802 / 100,000,000 = 230,400 / 100,000,000 = 0.002304 Ω.
Step 4 — Peak transient current using simplified formula:- Q * S_SC = 600,000 * 100,000,000 = 6e13
- sqrt(6e13) = 7.7459667e6
- I_peak = 7.7459667e6 / 480 ≈ 16,137 A
I_peak / I_Q ≈ 16137 / 722 ≈ 22.4
Step 6 — Approximate I2t in one 60 Hz cycle (for fuse consideration):I2t_cycle ≈ I_peak2 / (2f) = (161372) / 120 ≈ (2.603e8) / 120 ≈ 2,170,000 A2s
Interpretation and device selection:- Continuous current thermal requirement: choose breaker or fusible link rated > 722 A with typical engineering margin; e.g., 800 A continuous breaker or busbar rating with ambient corrections.
- Peak withstand: device must tolerate 16 kA making current. Choose breaker with making capacity or fuses selected with allowable let-through below their melting I2t. Typical LV power circuit-breakers have making capacities of 25–65 kA for medium frames, so choose a breaker frame meeting 16 kA making capacity.
- Fuse strategy: typical gG fuses may not survive such high I2t without opening. Consider time-delay fuses rated for higher I2t or add inrush-limiting reactor (series impedance) to reduce I_peak to acceptable levels, or use pre-insertion resistors or synchronous switching.
- Alternative: add a series reactor (e.g., X/R chosen to limit I_peak to ≤ 6–8x I_Q), or use a controlled closing device with pre-insertion resistance.
Case 2 — Medium-voltage bank: 2 MVAR at 11 kV, 50 Hz
Data:- Q = 2,000,000 VAR (2 MVAR)
- V = 11,000 V (line-to-line)
- f = 50 Hz (omega = 314 rad/s)
- Available short-circuit S_SC = 500 MVA = 500,000,000 VA
I_Q = Q / (sqrt(3) * V) = 2,000,000 / (1.732 * 11,000) = 2,000,000 / 19,052 ≈ 105 A
Step 2 — Per-phase capacitance (wye):C = Q / (omega * V2) = 2,000,000 / (314 * 11,0002)
Compute:- 11,0002 = 121,000,000
- Denominator = 314 * 121,000,000 ≈ 38,0e9 (approx 38,0e9)
- C ≈ 2,000,000 / 38,0e9 ≈ 5.26e-5 F (52.6 μF) per phase equivalent
Z_s = V2 / S_SC = 121,000,000 / 500,000,000 = 0.242 Ω
Step 4 — I_peak formula:- Q * S_SC = 2,000,000 * 500,000,000 = 1e15
- sqrt(1e15) = 31,622,776.6
- I_peak = 31,622,776.6 / 11,000 ≈ 2,874.8 A
I_peak / I_Q ≈ 2875 / 105 ≈ 27.4
Step 6 — I2t per 50 Hz cycle:I2t_cycle ≈ I_peak2 / (2f) = (28752) / 100 ≈ (8,265,625) / 100 = 82,656 A2s
Interpretation and device selection:- Continuous current: 105 A requires breaker/fuse rated greater than rated current; select 125–160 A device (depending on ambient and cable rating).
- Peak withstand: device must survive ~2.9 kA making; many medium-voltage circuit breakers and switchgear have rated making capacities above this value, but check manufacturer making capacity for MV switchgear.
- I2t exposure is significantly lower than Case 1 because absolute I_peak is lower and system frequency is lower; still compare to fuse characteristics.
- Consider series reactor (detuning/limiting coil) or pre-insertion resistors for large MV banks if nuisance operations occur, or apply synchronous recloser strategies and controlled switching.
Engineering recommendations and practical mitigations
When sizing protective devices and designing switching schemes for instant capacitor bank application, consider the following best practices:- Always compute both steady-state current and transient making current using the derived formulas and actual supply short-circuit power at the point of connection.
- Use manufacturer data for capacitor ESR, ESL, and expected transient behavior—these materially affect the damping of the LC oscillation.
- When selecting fuses, use I2t comparison methods: compute conservative I2t for the expected number of cycles (or use manufacturer transient curves) and ensure fuse let-through is acceptable.
- Prefer circuit breakers with adjustable instantaneous pickup and short-time delay settings to avoid nuisance tripping during capacitor switching while still providing fault protection.
- For very large banks or weak systems (low SSC), add series reactors or pre-insertion resistors and employ controlled closing strategies (synchronous closing) to substantially reduce I_peak.
- Use detuned filters or harmonic reactors where capacitor banks interact with harmonic-producing loads (to avoid resonance and amplified currents at harmonic frequencies).
- Coordinate upstream and downstream protection using time-current characteristic analysis and IEC/IEEE standard coordination practices.
Standards, normative references and authoritative resources
Consult the following normative and technical references when applying calculations and selecting equipment:- IEC 60909 — Short-circuit currents in three-phase AC systems (standard method for fault calculations). See: https://www.iec.ch/ (search IEC 60909)
- IEC 60871 series — Shunt Capacitors for Power Systems (specification for power capacitors). See: https://www.iec.ch/ (search IEC 60871)
- IEC 60269 — Low-voltage fuses (general requirements and selection guidance). See: https://www.iec.ch/ (search IEC 60269)
- IEC 60947-2 — Low-voltage switchgear and controlgear — Circuit-breakers (ratings and performance). See: https://www.iec.ch/ (search IEC 60947-2)
- IEC 61869 and IEC 60076 — Instrument transformers and power transformers (for determining transformer contribution and Z% values).
- IEEE PES and CIGRE technical brochures and working group reports on capacitor switching transients and protection (search IEEE Xplore and CIGRE resources for "capacitor switching transients").
- CIGRE brochure repository: https://www.cigre.org/
- IEEE Xplore digital library: https://ieeexplore.ieee.org/ (relevant papers on switching transients and capacitor bank protection)
- National or regional regulations and utility interconnection standards (refer to local codes for derating and selection rules).
Checklist for implementing an Instant Capacitor Bank Protective Device Sizing Calculator
When building an engineering calculator or spreadsheet for sizing, include the following inputs and outputs: Inputs (user-supplied):- Q (kVAR)
- Nominal voltage V (line-to-line)
- Connection type (wye/delta)
- Grid frequency f (50/60 Hz)
- Available short-circuit SSC (MVA) at point of connection or percent Z of transformer
- Device type preferences (fuse/breaker) and device I2t curves if available
- Capacitor ESR/ESL (optional but recommended)
- C per phase (F)
- I_Q (steady-state current)
- I_peak (transient worst-case making current)
- I_peak / I_Q (inrush multiple)
- Z_s and L (equivalent inductance)
- I2t estimates per cycle and cumulative for given durations
- Recommended device continuous rating and suggested making/withstand rating
- Suggested mitigation measures (series reactor size, resistor value, etc.)
Final engineering notes and suggestions
Selecting protective devices for instant capacitor bank switching requires quantifying three aspects: continuous thermal stress, short-term energy exposure, and instantaneous peak current capability. The derived relations offered here (I_Q, C from Q, and I_peak = sqrt(Q * S_SC) / V) provide robust engineering approximations to size devices and to determine the need for mitigation. However, always confirm with manufacturer test data, local regulatory requirements, and site-specific short-circuit studies using IEC 60909 (or equivalent national standards) for precise coordination. Before commissioning:- Validate calculated I_peak and I2t with manufacturer transient curves and with actual site short-circuit data.
- Perform time-current coordination studies including protection curves for upstream and downstream devices.
- Where high inrush is predicted, consider pre-insertion resistor switching or series reactors, and update protection settings accordingly.
- Document switching sequences and protective device settings in the system protection and operations manual.
- IEC 60909 — Short-circuit currents in three-phase AC systems. International Electrotechnical Commission.
- IEC 60871 — Shunt capacitors for power systems. International Electrotechnical Commission.
- IEC 60269 — Low-voltage fuses. International Electrotechnical Commission.
- IEEE PES technical papers on capacitor switching transients (IEEE Xplore).
- CIGRE technical brochures on capacitor bank switching and harmonic interaction (CIGRE).