Electrical reliability indices quantify power system performance under interruptions, enabling data-driven asset management decisions strategically.

This guide explains calculation methods, essential indices, tools, and best practices for dependable power networks.

Electrical Reliability Index Calculator — Core Indices (SAIFI, SAIDI, CAIDI, ASAI)

Upload a nameplate photograph or outage diagram to suggest values (service will analyze via configured AI endpoint).

Please enter input values to compute reliability indices.
Formulas and units

SAIFI = (Total customer interruptions) / (Total customers)   [interruptions/customer·period]

SAIDI = (Total customer interruption duration) / (Total customers)   [hours/customer·period]

CAIDI = SAIDI / SAIFI   [hours/interruption] (if SAIFI > 0)

ASAI = (1 - SAIDI / PeriodHours) × 100%   [% available time]

ASUI = SAIDI / PeriodHours   [unitless fraction of unavailability]

PresetCustomersCustomer InterruptionsCustomer·hoursImplied SAIDI / SAIFI
Distribution — Urban10,00015,00030,000SAIDI=3 h, SAIFI=1.5
Distribution — Rural5,00015,00045,000SAIDI=9 h, SAIFI=3.0
Industrial plant2,00020050SAIDI=0.025 h, SAIFI=0.1
Data center10020.1SAIDI=0.001 h, SAIFI=0.02
FAQ

Q: Which period should I use?

A: Use the reporting timeframe of your dataset (year = 8760 h is standard for annual indices; monthly = 730 h may be used for short-term analysis).

Q: How are planned outages treated?

A: Planned interruption duration may be removed from customer·hours if you want indices representing unplanned reliability only; provide planned customer·hours in the optional field to subtract before calculations.

Q: What if SAIFI is zero?

A: CAIDI is undefined if SAIFI = 0; the calculator returns 'N/A' for CAIDI in that case and presents a note in the detail section.

Overview of electrical reliability indices and their importance

Reliability indices translate raw outage data into measurable performance metrics for utilities, regulators, and customers. They enable trend analysis, investment prioritization, contractual benchmarking, and compliance reporting across transmission, distribution, and customer-facing operations. Reliability indices also drive asset-management decisions, resilience planning, and automated restoration strategies. Accurate index calculation requires consistent data ingestion, time synchronization, and rigorous handling of momentary versus sustained interruptions.

Core indices: definitions, formulas, and typical values

SAIDI (System Average Interruption Duration Index)

SAIDI = (Σ Customer interruption durations) ÷ (Total customers served)

Variable definitions:

  • Σ Customer interruption durations: sum of all outage durations weighted by number of customers affected (customer-minutes or customer-hours).
  • Total customers served: number of customers in the utility service territory (count).
  • Units: minutes/year or hours/year depending on aggregation.

Typical values: urban utilities: 50–200 minutes/year; rural utilities: 200–1000+ minutes/year.

Electrical Reliability Index Calculator Best Must Have for Accurate Power Assessments
Electrical Reliability Index Calculator Best Must Have for Accurate Power Assessments

SAIFI (System Average Interruption Frequency Index)

SAIFI = (Σ Number of customer interruptions) ÷ (Total customers served)

Variable definitions:

  • Σ Number of customer interruptions: total count of customer interruption events (each customer counted for each sustained interruption).
  • Total customers served: number of customers in the service territory.
  • Units: interruptions per customer-year.

Typical values: urban: 0.5–2.0 interruptions/year; rural: 2.0–6.0 interruptions/year.

CAIDI (Customer Average Interruption Duration Index)

CAIDI = SAIDI ÷ SAIFI = (Σ Customer interruption durations) ÷ (Σ Number of customer interruptions)

Variable definitions:

  • CAIDI indicates average restoration time per sustained interruption (units: minutes or hours).

Typical values: CAIDI commonly ranges from 30 minutes to several hours depending on crew response, switching practices, and automation.

MAIFI (Momentary Average Interruption Frequency Index)

MAIFI = (Σ Number of customer momentary interruptions) ÷ (Total customers served)

Variable definitions:

  • Momentary interruptions: typically interruptions shorter than a defined threshold (e.g., <1 minute or <5 minutes depending on utility policy).

Typical values: 0.1–10 events/year depending on network configuration and protection nuisance tripping.

ENS (Energy Not Supplied)

ENS = Σ (Load interrupted × Interruption duration)

Variable definitions:

  • Load interrupted: average or measured MW or kW affected by each outage.
  • Interruption duration: time the load was without supply (hours).
  • Units: MWh or kWh not supplied.

Typical values: used for cost-of-energy-not-supplied (CENS) calculations and regulatory reporting; values vary widely by event magnitude.

ASAI and ASUI (Average Service Availability Index and Unavailability)

ASAI = (Total service time − Total customer interruption time) ÷ (Total service time)
ASUI = 1 − ASAI

Variable definitions:

  • Total service time: number of customers × observation period (hours).
  • Total customer interruption time: Σ customer interruption durations.

Typical values: ASAI close to 0.9995–0.9999 for utilities with high availability.

Data requirements and pre-processing for accurate calculations

Reliable index calculation depends on high-quality data. Key requirements include:
  • Accurate outage start and end timestamps with timezone awareness and consistent time base (UTC recommended).
  • Customer counts per feeder/segment and customer classification (residential, commercial, industrial).
  • Load profile or estimated connected load per customer or per feeder for ENS calculations.
  • Event metadata: protection device IDs, fault causes, automatic switching actions, manual crew interventions.
  • Momentary interruption threshold definitions and consistent classification rules.
Pre-processing steps:
  1. Normalize timestamps to a single time standard and align daylight saving adjustments.
  2. Validate customer counts against billing system; reconcile temporary meters or new connections.
  3. Filter out planned outages if indices exclude them, or tag planned outages for optional inclusion.
  4. Aggregate parallel events that belong to a single root cause to avoid double counting.

Designing an electrical reliability index calculator: essential features

An effective reliability index calculator should include:
  • Ingest multiple data sources: SCADA/EMS, OMS (Outage Management System), AMI (Advanced Metering Infrastructure), GIS, and asset database.
  • Configurable definitions: momentary threshold, planned outage handling, customer weighting, and per-segment customer counts.
  • Real-time and historical computation modes with incremental updates for operational dashboards.
  • Audit trail and data lineage: preserved raw events, transformations, and calculation steps for regulatory audits.
  • Exportable reports in CSV, XLSX, and regulatory-required formats including attachments and event narratives.
  • Visualization: trend charts, heat maps, feeder-level breakdown, and drill-down into individual outage events.
  • APIs for integration with asset management, workforce management, and regulatory reporting systems.
  • Scenario modeling: Monte Carlo simulations, sensitivity to crew availability, and DER (distributed energy resources) islanding impacts.
  • Validation engine: anomaly detection, missing data flags, and reconciliation tools.

Algorithmic considerations and special cases

  • Momentary events: decide whether to include MAIFI in total frequency measures or keep separate.
  • Multiple interruptions to same customer during a large event: determine counting rules (count each customer-outage or collapse contiguous interruptions within an event window).
  • Partial supply restoration: weighted durations when customers partially supplied (e.g., reduced voltage or single-phase conditions).
  • Shared outages due to upstream events: propagate impact properly across dependent feeders and customers to avoid double counting.
  • Data gaps: impute using conservative estimates or exclude periods with documented telemetry loss.
Typical ranges of core reliability indices by system type
System Type SAIDI (minutes/year) SAIFI (interruptions/customer-year) CAIDI (minutes) MAIFI (interruptions/customer-year)
Urban overhead network 50–200 0.5–1.5 40–150 0.2–2.0
Rural overhead network 200–1200 2.0–6.0 60–300 0.5–5.0
Underground urban network 20–80 0.2–1.0 20–100 0.1–1.0
Industrial campus 10–150 0.1–2.0 50–200 0.0–1.0

Formulas implemented in a calculator and variable explanations

Use clear, machine- and human-readable formulas in the UI and audit logs. Examples (HTML-only):
SAIDI = (Σ (Ni × Di)) ÷ Ntot

where:

  • Ni = number of customers affected by outage i
  • Di = duration of outage i (hours or minutes)
  • Ntot = total customers served

Example typical values for a feeder: Ni = 1,200 customers, Di = 2 hours, Ntot = 50,000 customers.

SAIFI = (Σ Ni) ÷ Ntot

where:

  • Σ Ni is the sum of customers interrupted across all sustained events in the period
CAIDI = SAIDI ÷ SAIFI = (Σ (Ni × Di)) ÷ (Σ Ni)
ENS = Σ (Pi × Di)

where:

  • Pi = average load disconnected during outage i (kW)
  • Di = outage duration in hours
  • ENS units: kWh or MWh
ASAI = 1 − (Σ (Ni × Di)) ÷ (Ntot × T)
where T = observation period (hours in year = 8760)

Example 1 — Urban utility feeder: full development and solution

Context: A medium-sized urban utility with 50,000 customers records the following sustained outages during one calendar year for a feeder group. All timestamps validated; no planned outages included.
Outage log — Example 1
Event ID Customers affected (Ni) Start End Duration (Di, hours) Average load affected (kW)
E112002024-03-05 02:152024-03-05 04:152.0700
E28002024-06-12 11:002024-06-12 13:302.5500
E34502024-09-30 18:202024-09-30 19:050.75300
E43002024-10-10 23:002024-10-11 01:302.5250
E51502024-12-01 08:452024-12-01 09:150.5200
Step-by-step calculations: 1) Compute Σ (Ni × Di): - E1: 1200 × 2.0 = 2400 customer-hours - E2: 800 × 2.5 = 2000 customer-hours - E3: 450 × 0.75 = 337.5 customer-hours - E4: 300 × 2.5 = 750 customer-hours - E5: 150 × 0.5 = 75 customer-hours Total Σ (Ni × Di) = 2400 + 2000 + 337.5 + 750 + 75 = 5562.5 customer-hours 2) Convert to minutes if SAIDI desired in minutes/year: 5562.5 hours × 60 = 333,750 customer-minutes 3) SAIDI (hours/customer-year) = Σ (Ni × Di) ÷ Ntot = 5562.5 ÷ 50,000 = 0.11125 hours/customer-year SAIDI in minutes = 0.11125 × 60 = 6.675 minutes/customer-year 4) Σ Ni (for SAIFI) = 1200 + 800 + 450 + 300 + 150 = 2,900 customer interruptions 5) SAIFI = Σ Ni ÷ Ntot = 2,900 ÷ 50,000 = 0.058 interruptions/customer-year 6) CAIDI = SAIDI ÷ SAIFI = 0.11125 hours ÷ 0.058 = 1.918 hours ≈ 115.1 minutes 7) ENS = Σ (Pi × Di) in kWh: - E1: 700 kW × 2.0 h = 1400 kWh - E2: 500 × 2.5 = 1250 kWh - E3: 300 × 0.75 = 225 kWh - E4: 250 × 2.5 = 625 kWh - E5: 200 × 0.5 = 100 kWh Total ENS = 3600 kWh = 3.6 MWh Interpretation: For this urban feeder group, SAIDI ≈ 6.7 minutes/year, SAIFI ≈ 0.058/year, CAIDI ≈ 115 minutes. This utility demonstrates excellent reliability compared with typical urban ranges, suggesting localized events only.

Example 2 — Industrial campus with multiple feeders: development and solution

Context: An industrial site with 3 feeders and 2,500 connected service points; calculation period: one year. The industrial site differentiates customers into small loads and process-critical loads; ENS is crucial.
Outage log — Example 2
Event Feeder Customers affected (Ni) Duration (Di, minutes) Avg load affected per customer (kW)
AF16001805.0
BF21500452.0
CF12002010.0
DF32006008.0
Step-by-step: 1) Convert durations to hours for SAIDI/ENS: - A: 180 min = 3.0 h - B: 45 min = 0.75 h - C: 20 min = 0.3333 h - D: 600 min = 10.0 h 2) Σ (Ni × Di): - A: 600 × 3.0 = 1800 customer-hours - B: 1500 × 0.75 = 1125 customer-hours - C: 200 × 0.3333 ≈ 66.67 customer-hours - D: 200 × 10.0 = 2000 customer-hours Total = 4991.67 customer-hours 3) SAIDI (hours/customer-year) = 4991.67 ÷ 2,500 = 1.9967 hours/customer-year SAIDI in minutes = 1.9967 × 60 ≈ 119.8 minutes/customer-year 4) Σ Ni = 600 + 1500 + 200 + 200 = 2,500 customer interruptions (note this equals total customers meaning many saw at least one interruption) 5) SAIFI = 2,500 ÷ 2,500 = 1.0 interruptions/customer-year 6) CAIDI = SAIDI ÷ SAIFI = 1.9967 hours ≈ 119.8 minutes 7) ENS calculation (kWh): - A: avg load per customer 5.0 kW → feeder load = 600 × 5.0 = 3,000 kW → energy = 3000 × 3.0 = 9,000 kWh - B: 1500 × 2.0 = 3,000 kW → energy = 3,000 × 0.75 = 2,250 kWh - C: 200 × 10.0 = 2,000 kW → energy = 2,000 × 0.3333 ≈ 666.67 kWh - D: 200 × 8.0 = 1,600 kW → energy = 1,600 × 10.0 = 16,000 kWh Total ENS = 27,916.67 kWh ≈ 27.92 MWh Interpretation: Industrial campus has SAIFI = 1.0 and SAIDI ≈ 2.0 hours/year. The large ENS (≈28 MWh) indicates significant energy not supplied to process loads; prioritize automation and protection coordination on feeder F3 which produced the longest event.

Benchmarks, targets, and regulatory reporting

Setting targets requires benchmarking against peers and regulatory standards. Typical approaches:
  • Top quartile benchmarking: define targets at the 25th percentile of peer utilities for SAIDI and SAIFI.
  • Critical customer performance: set stricter targets for industrial or life-safety customers and include contractual SLAs.
  • Regulatory compliance: map data outputs to required regulatory formats (e.g., annual SAIDI/SAIFI submissions) and maintain audit trails.
Normative references commonly used:
  • IEEE Std 1366-2012 — Guide for Electric Power Distribution Reliability Indices. (Useful for index definitions and event classification.)
  • NERC standards and regional reliability councils — for bulk system reliability metrics and reportable disturbances.
  • IEC 61000 series and EN 50160 — voltage quality and supply characteristics for customers (complements reliability indices).
  • ISO 55000 — asset management guidance informing lifecycle cost optimisation and investment decisions linked to reliability.
Suggested external links (authority sources):
  • IEEE Xplore — IEEE Std 1366 resource: https://standards.ieee.org/standard/1366-2012.html
  • NERC — North American Bulk Electric System reliability standards: https://www.nerc.com
  • IEC standards catalog: https://www.iec.ch
  • EN 50160 overview via CENELEC: https://www.cenelec.eu

Validation, uncertainty, and sensitivity analysis

A robust calculator must quantify uncertainty and sensitivity:
  • Confidence intervals: propagate measurement uncertainty in timestamps, customer counts, and load estimates to produce error bounds for SAIDI/SAIFI.
  • Monte Carlo simulation: model the impact of data gaps, varying crew response times, and different classification thresholds on annual indices.
  • Sensitivity reporting: show which events contribute most to SAIDI and ENS (Pareto chart of top events by customer-hours and energy not supplied).

Practical steps for uncertainty handling

  1. When timestamps are coarse-grained (e.g., minute-level), assume up to ±30 seconds variance and account for this in small-duration events.
  2. For load estimates, use interval meter data when available; otherwise, apply customer class load profiles with documented assumptions.
  3. Flag events with >X% estimated data and exclude or highlight them in regulatory submissions until reconciled.

Integration, APIs, and deployment considerations

Best-practice architecture for a reliability index calculator:
  • Data lake for raw telemetry ingestion, versioned and immutable.
  • ETL pipelines to normalize and enrich outage events with GIS, billing, and asset data.
  • Computation engine capable of batch re-calculation and incremental streaming updates for near-real-time dashboards.
  • Role-based UI for analysts, regulatory officers, and operations with configurable report templates.
  • APIs for integration with mobile workforce tools for crew dispatch and automated event closure on successful restoration.
Security and privacy:
  • Ensure customer data protection per regional privacy laws (e.g., GDPR in EU), anonymize where not required.
  • Use secure APIs with authentication and authorization (OAuth2, RBAC).

Advanced techniques: modeling restoration strategies and DER effects

Advanced calculators include:
  • Restoration optimization: simulate switching sequences to minimize customer-minutes using graph algorithms on the network model.
  • DER and microgrid impacts: model how distributed generation, storage, and islanding change effective customer interruption durations and ENS.
  • Reliability block diagrams and fault-tree analysis for asset-level contributions to system indices.
Example algorithmic idea:

Use Dijkstra or multi-criteria shortest-path to evaluate minimum time-to-restore across switching options considering crew arrival times and sectionalizer operations.

Regulatory and contractual reporting: mapping outputs to obligations

Ensure the calculator produces:
  • Regulator-ready annual reports with audit trail and event narratives.
  • Customer-facing SLA reports with per-customer metrics where contractually required.
  • Incident reports for major events with root-cause classification and corrective action tracking.

Checklist — must-have features for an electrical reliability index calculator

  1. Accurate timestamp normalization and timezone handling
  2. Configurable definitions (momentary thresholds, planned outages)
  3. Integration with OMS, AMI, SCADA, GIS, and billing systems
  4. Robust data validation, lineage, and audit trails
  5. Real-time incremental computation and historical recalculation
  6. Advanced ENS calculation using interval loads or customer-class profiles
  7. Visualization and drill-down for Pareto analysis of events
  8. Exportable regulatory formats and API endpoints
  9. Security, privacy compliance, and role-based access
  10. Uncertainty quantification, sensitivity analysis, and scenario simulation

References and further reading

  • IEEE Std 1366-2012, "IEEE Guide for Electric Power Distribution Reliability Indices" — definitions and event classification. https://standards.ieee.org/standard/1366-2012.html
  • NERC Reliability Standards — regional and bulk system reliability frameworks. https://www.nerc.com
  • IEC standards: general reference for electrical measurements and power quality. https://www.iec.ch
  • EN 50160 description of supply voltage characteristics in public distribution systems. https://www.cenelec.eu
  • ISO 55000 family — asset management guidance and lifecycle costing principles. https://www.iso.org/iso-55000-asset-management.html
  • CIGRE technical brochures and working group reports on distribution reliability modeling. https://www.cigre.org
The above framework and practical examples provide a complete technical baseline for implementing, validating, and operating an electrical reliability index calculator. Prioritize reproducible calculations, configurable definitions aligned with normative references, and transparent audit trails to support regulatory compliance, operational excellence, and continuous improvement.