Sonotube Concrete Calculator: Volume, Bags and Piers

Sonotube Concrete Calculator

Estimate concrete volume, whole bags, ready-mix quantity and form tubes for round piers or columns.

Use the actual inside diameter when available.

Add tubes of another size

Allowance, bags, ready mix and tube stock
Copy the yield from the exact product label.
Identical pieces are cut from this stock length.

Concrete to plan
Volume including allowance
Whole bags
Bag material cost
Ready-mix volume and material cost
Separate base volume
Bag yield left over
Total form-tube length
Stock form tubes
Average concrete per pier

Tube-group breakdown
GroupQuantityTube concreteBase concreteStock tubes

Formulas

Tube volume = π × diameter² ÷ 4 × fill length × quantity. A straight base is another cylinder. A tapered or bell base is treated as a conical frustum: V = πh(D² + Dd + d²) ÷ 12, where D is the bottom diameter and d is the tube diameter.

Worked example

Six 12 in diameter tubes filled 4 ft high require about 18.850 ft³ before allowance. With 10% added, that is about 20.735 ft³ or 0.768 yd³. At 0.60 ft³ of mixed yield per bag, order 35 whole bags. A 12 ft stock tube produces three 4 ft forms, so two stock tubes cover six identical piers.

Why this differs from a general concrete calculator

This tool combines multiple tube sizes, optional enlarged bases, whole bags, ready-mix volume and a simple stock-tube cutting count. Use the general Concrete Calculator for slabs, rectangular footings and other shapes.

Limits

  • Sonotube is a brand name commonly used for round fiber forms. Use the actual inside diameter and product instructions for the form you buy.
  • The base is modeled directly below the tube and does not overlap its cylindrical fill. Excavation irregularity, loss, consolidation and overfill require an appropriate allowance.
  • Stock-tube counts assume identical straight cuts within each group. When a form is longer than the entered stock length, the result flags that a longer or manufacturer-approved joined form is needed.
  • Bag yield and ready-mix price are user inputs. The result excludes short-load charges, delivery, pumping, reinforcement, excavation, brackets, labor and tax.
  • This is a quantity estimate, not a structural footing or pier design. Diameter, depth, base geometry, reinforcement, frost depth, soil capacity and connections require project-specific design and local code compliance.

Related tools: Concrete Calculator, Fence Post Concrete Calculator, Volume Calculator and Rebar Calculator.